women building futures
Edmonton, AB
1600 m²
2007
This project involved the retrofitting and expansion of an existing building. 2 new storeys and an elevator were added. The basement was also reconstructed.
The building's operational requirements included workshops, classrooms, administration and teacher offices, as well as 42 studio, 1 and 2 bedroom units of affordable student housing.
Triple glazing, a high-efficiency boiler, energy efficienct lighting and elevator were used to lower long-term operating costs.
women building futures
Edmonton, AB
1600 m²
2007
This project involved the retrofitting and expansion of an existing building. 2 new storeys and an elevator were added. The basement was also reconstructed.
The building's operational requirements included workshops, classrooms, administration and teacher offices, as well as 42 studio, 1 and 2 bedroom units of affordable student housing.
Triple glazing, a high-efficiency boiler, energy efficienct lighting and elevator were used to lower long-term operating costs.